The demolition is almost completed. All that's left is removing the old windows in the bathroom. The above window is being removed and replaced with a transom window that will be placed up to the ceiling line.
The skylight is in the shower and will double in size. This will give the shower area great light and a view of the river.
The entry french doors are relocated forward into the third floor landing to allow the doors to the Master Bath and Ladies Walk In Closet to be in the bedroom. Before both of these doors were located out of the bedroom in the hall landing area.
Master Bedroom ceiling is framed . It is now a balanced ceiling. Wait and see what we will do with it!
Ladies Closet framing begins.